Project Nahla Open Transit Voyage Badge A.R.C. Cor Draconis Insignia Badge
Status

Project Nahla Open Transit Voyage

Carrier departure from Colonia / Pennsylvania on 24th Sept 3312 / 2026 at 19:30 GMT.

--
Days
--
Hours
--
Minutes
--
Seconds
Live UTC --:--:-- UTC
Departure Window 24 Sept 2026 β€’ 19:30:00 GMT
Carrier Status PRE-DEPARTURE STANDBY
Galactic Region Outer Orion-Perseus Conflux
Galactic Waypoints & Route Trajectory
1st Quadrant Traverse
Leg 01 β€’ Sept 2026 – Dec 2026 Next Jump Sequence
Colonia / Pennsylvania βž” Orio-Persean Conflux βž” Hope System (Nahla β€’ Outer Arm)
Departure follows the Colonia 10-Year Anniversary celebrations. Transit crosses the Outer Arm Rift heading outward to 43,895 light-years from Sol. Estimated carrier arrival at Nahla in December 2026.
Leg 02 β€’ Primary Research Residence Observation Post (~1 Month)
Hypi Bra EV-P d5-78 6 a (Nahla) βž” The Outer Arm Rift βž” Erikson's Star (The Void)
The A.R.C. Cor Draconis stations itself in the Hope system. Surface study conducted mostly at PΓ’te SablΓ©e crater, Natalja's Pass (39.23, 104.28). The carrier then moves towards Erikson's Star in The Void.
Leg 03 β€’ Homeward Transit Mid-to-Late 3313 (2027)
Erikson's Star (The Void) βž” Perseus Arm & The Fallows βž” Gali / The Bubble (Inner Orion Spur)
Traversing back through Via Maris and the Perseus Arm, heading inward and eventually reaching the core bubble in summer/autumn 2027.